# 2025-03 Leonardo Greensboro Pick-List Operations for ASP Deployment
Leonardo's LPR-Greensboro NC operations center generates two warehouse pick lists fulfilling Arkansas State Police orders. **Task 146353** on 2025-03-11 11:08 AM EST handles PO 4502265167 (the smaller buy: 2 F4 2L cameras + EOC license + pole mount). **Task 146391** on 2025-03-13 9:23 AM EST handles PO 4502235324 (the larger buy, partial — six site-specific picks). Both ship to ASP Central Supply at #1 State Police Plaza Drive, Little Rock, AR 72209 (Customer ID 11000115).
## Sources
- [[Leonardo Pick Lists and ASP Deployment Sites]] — pages 3-16 and 32 of `1513_001.pdf`.
## Significance
- **The corpus's deployment-location anchor for ASP.** Task 146391's Customer Information lines name six Arkansas Interstate-highway sites: I-30 Hope MM64.25; I-530 Big Rock Twp; I-40 Little Rock MM159; I-30 Little Rock; I-40 Maumelle; I-530 Big Rock Twp (second reference). All sites are central-Arkansas or southwestern-Arkansas Interstate corridors; five of six are in the Pulaski County metro area.
- **Later Tier-1 records add exact coordinates without erasing the pick-list ambiguity.** Install mail supplies exact Site 3, Site 4 WB, and Site 6 SB points; ARDOT GIS supplies one Hope point and paired North Little Rock, Little Rock, Maumelle, and Landmark points. The version-aware crosswalk is on [[Leonardo Pick Lists and ASP Deployment Sites]] and [[Arkansas ALPR Camera Coordinates and Directional Nomenclature]].
- **The deployment is wireless-cellular, not network-tethered.** Each site receives one F4 FCU-POE Wireless camera plus one Sierra Wireless Airlink RV55-style cellular modem.
- **Approximately seven months elapsed between the larger PO and the pick-list operations.** PO 4502235324 issued 2024-08-19; pick list dated 2025-03-13. The intervening period covers Leonardo manufacturing lead-time, ASP site-preparation work (likely including ARDOT right-of-way coordination, not in this batch), and shipping logistics.
- **The pick lists are equipment-fulfillment-only.** No deployment architecture, network-sharing configuration, or operational-policy detail surfaces from the pick lists themselves. Those dimensions later surfaced in the July Item-2 production: fixed and Street Sentry site coordination, operator training, HIDTA domain administration, silent-list provisioning, and cross-network analyst access ([[Fixed-LPR Deployment and Street Sentry Site Surveys]], [[ASP ALPR Operator Training Program]], [[ASP–Houston HIDTA MOU and ELSAG Domain Architecture]]). Dedicated Item-3 audit/usage data remains absent.