# T060 - Benton Requested Audit Period vs Produced Coverage
The request sought retained audit records from 2025-01-01 through receipt. The first production supplies audits only from 2025-11-01 forward and truncates March 2026 at March 12, without a category-specific explanation.
## Statement A
The filed request asks for retained audit records `"from 2025-01-01"` (Gmail thread `19f904f79dee8e61`; `raw/benton-pd/_filed.md`, request row).
## Statement B
The earliest produced file is `11_1_2025-11_30_2025-Benton AR PD-Audit (REDACTED).pdf`. No January-October 2025 audit file appears. The March file is titled `3_1_2026-3_12_2026-Benton AR PD-Audit (REDACTED).pdf`, followed by a file beginning April 1.
## Why it matters
The missing periods prevent a continuous retention, search-volume, and access-practice analysis. Their absence could reflect retention, export, withholding, collection, or delivery choices; the production does not identify which.
## Resolution status
`open`. A supplemental export or a category-specific disposition is needed to determine whether the missing periods exist, were withheld, expired, or were not maintained.
## Discovery
Surfaced during the August 17, 2026 file-period reconciliation of Benton's first production.